Yawei’s SZ-13000/115 is a high-efficiency 13MVA power transformer designed for 115 kV/xx kV voltage conversion, compliant with IEC, IEEE, and GB standards. Key features include:

✔Low-loss silicon steel core (efficiency >99%) for reduced energy waste

✔ONAN/ONAF cooling ensuring stable performance under varying loads

Ideal for substations, industrial plants, and renewable energy integration, this transformer offers a 40+ year design life with customizable options (taps, bushings, protection systems). Robust construction and advanced insulation ensure reliability in demanding environments.

Product Advantage

Yawei SZ-13000-115/10.5 Power Transformer – Reliable & High-Performance Solution

1. High-Efficiency Power Transformer with Low Losses

The SZ-13000-115/10.5 is a high-efficiency electrical transformer designed for step-up/step-down applications, featuring an ultra-low-loss silicon steel core. With no-load loss ≤15kW and load loss ≤70kW (GB/T 6451 standard), it achieves >99.2% efficiency, reducing operational costs by 10-15% compared to conventional models. Ideal for utilities and industrial plants seeking energy-saving power transformer suppliers.

2. Robust Cooling & Overload Capability

Equipped with ONAN/ONAF cooling, this power transformer ensures stable operation in harsh environments (-30°C to +45°C). Its smart temperature control enables 120% overload capacity for 2 hours, making it perfect for renewable energy integration. Customers looking to buy power transformer online benefit from its reliable performance.

3. Globally Certified for Safety & Compliance

Fully compliant with IEC 60076, IEEE C57.12, and GB 1094, this transformer holds UL/cUL, KEMA, and CE certifications. Its 8% short-circuit impedance and reinforced structure pass rigorous testing, ensuring a <0.3% annual failure rate. Trusted by global ODM/OEM transformer partners.

4. Flexible Customization & Fast Delivery

Tailored solutions include ±8×1.25%/±9×1.78% on-load tap changers, <65dB noise reduction, and C5-M anti-corrosion coating. With 200+ successful global deployments, we offer a 12-week lead time—contact us for a transformer price list or project-specific requirements.

>> Technical Parameters

TypeStep downpower transformer
ModelSZ-13000-115±9*1.78%/10.5
Cooling MethodONAN/ONAF
Primary Voltage115KV
Secondary Voltage10.5kV
Rated Frequency50HZ
Rated Power13MVA
Winding MaterialCopper
Voltage RegulationOLTC
Tapping Range±8×1.78%
Connection GroupYNd11
Transformer Dimension6200×4200×5000mm
Weight33000kg

>> Product Uses

Here are four specific application scenarios of Power Transformer:

1. Utility Substations & Grid Infrastructure

The SZ-13000-115/10.5 power transformer is ideal for 110kV/35kV substations, enabling efficient voltage conversion between transmission and distribution networks. With ONAN/ONAF cooling and >99.2% efficiency, it minimizes energy loss in grid operations. Its 8% short-circuit impedance ensures stability during peak loads, making it a reliable choice for national power grids and urban infrastructure projects.

2. Renewable Energy Integration (Solar/Wind Farms)

Designed for step-up applications in renewable plants, this transformer connects 35kV wind turbines or solar arrays to 115kV grids. The 120% overload capacity handles intermittent renewable generation, while UL/cUL certification meets global green energy standards. Over 50 units are deployed in Asian and North American wind farms.

3. Heavy Industrial Facilities (Mining/Metallurgy)

In mining and steel plants, the transformer’s reinforced tank (C5-M anti-corrosion coating) withstands harsh environments. The <65dB noise level complies with OSHA standards, and DGA monitoring prevents oil degradation from heavy loads. Custom ±8×1.25%/±9×1.78% taps adapt to volatile industrial demand.

>> Product Operate Guide

Generic installation and use instructions for 110kV class power transformers, containing the following sections:

1. Lifting and jacking of transformer body

2. Transportation and handling

3. Check and acceptance

4. Storage and keeping of product (body and component)

5. Overall reassembly on site

6. Vacuum oil filling: vacuum oil filling must be conducted after general assembly of the transformer has been fully completed.

7. External surface cleaning and painting makeup of transformer

8. Check and handover test before commissioning

9. Operation

10. Inspection and maintenance